Project Name: Energy Conservation keping a 20MWp photovoltaic power plant project EPC Contract
Project Description:
Xinjiang Uygur Autonomous Region is located in the middle of the Eurasian continent, located in China's northwest border, with a total area of 1,664,900 square kilometers, accounting for one sixth of the total land area, and the surrounding eight countries Russia, Kazakhstan and other border; land border line up more than 5600 kilometers, accounting for a quarter of the land border, China is the largest and longest land border, next to the largest country provinces.
Xinjiang is located in the heart of mid-latitude Eurasia, not only by the temperate weather systems around, but also often polar air mass, affecting sub-tropical weather systems and even low-latitude weather systems, plus far from the sea, has obvious temperate continental arid climate, That winter, summer and cold change and the poor, daily temperature changes, dry and dry, light-rich, high winds and strong winds more than a few days. Tianshan things lie on the north cold air played barrier, forming the southern, northern two climatic zones. Southern warmer, dry and dry, more dust weather, the northern cold, windy.
Kalpin county is located in the northwest edge of the Tarim Basin, south of the mountain Cole Tagg, the landscape classification both hills, there are plain, County terrain northwest, southeast, altitude 1060m ~ 4049m. Points south, west and north of the mountains, keping Pereleshin piedmont basin and alluvial plain three landscape units, terrain, desert, Gobi, mountainous area of the total area of 72.4 percent.
Keping county warm temperate continental arid climate, scarce rainfall, severe water scarcity, the county is only 2.9m3 / s of surface water, the ecological environment is very fragile, it is one of the counties largest sand dust. 2788 hours of sunshine throughout the year, the daily average of 7.6 hours, sunshine percentage is 63%; the annual average temperature 11.8 ℃, the average daily temperature 14.6 ° C; annual average frost-free period 215 days; average annual rainfall of 113.8mm; annual evaporation 2864.8mm, evaporation is more than 40 times the rainfall.
Energy-saving keping one of 20MWp photovoltaic power generation project is located in Aksu Prefecture kalpin county, located in the photovoltaic industry park kalpin county east of a straight line at a distance of 50km from the 314 national road about 100m, field area relatively flat terrain, convenient transportation, geographical conditions. Project scale total capacity of 40MWp, the current period is a capacity of 20MWp, supporting projects including building a new 35kV switching station, assembly bracket and infrastructure, repair roads and other content. After the project is completed, the annual average grid electricity 25543.16MWh, equivalent to an annual average utilization hours 1277h.