Energy-saving keping one of 20MWp photovoltaic power generation project is located in Aksu Prefecture kalpin county, located in the photovoltaic industry park kalpin county east of a straight line at a distance of 50km from the 314 national road about 100m, field area relatively flat terrain, convenient transportation, geographical conditions. Project scale total capacity of 40MWp, the current period is a capacity of 20MWp, supporting projects including building a new 35kV switching station, assembly bracket and infrastructure, repair roads and other content. After the project is completed, the annual average grid electricity 25543.16MWh, equivalent to an annual average utilization hours 1277h.